Project type: Prefab Warehouse
Location: Niger
Type of Structure: Steel Structure
Quantity: 4 sets
Size of Each Set: 29m x 25m x 8m
The project encompasses a prefabricated steel structure warehouse designed and constructed for our client in Niger. The warehouse consists of four independent steel container units, each of length 29 meters, width 25 meters, and height 8 meters. The design and construction of the warehouses provide a robust, efficient, and economical solution for the client's storage and operational purposes in an industrial setup.
Steel structures have been selected for their durability, quick adaptability, and suitability for the local environment in Niger. The design specifications for each unit of the warehouse are as follows:
- Dimensions: 29 m (L) x 25 m (W) x 8 m (H)
- Materials: High-quality steel frame with 50 mm thick polyurethane (PU) sandwich panels for the walls and roof, ensuring good insulation and weather resistance.
- Roof Design: The roof is slightly sloped to facilitate efficient drainage, as illustrated in the technical drawings.
- Ventilation: Ventilators are strategically placed on the roof to ensure proper ventilation and temperature regulation within the warehouse.
- Foundation: A solid concrete base with a brick-built foundation increases stability and helps prevent moisture from the ground.
The provided elevations and sections emphasize the structural integrity and design efficiency of the warehouse, focusing on maximizing internal space while maintaining a reinforced exterior.
The construction of the four warehouse units was carried out in phases to ensure timely completion and adherence to quality standards. Key phases included:
1. Site Preparation: The site was leveled and prepared for foundation work, as shown in the aerial view of the construction area.
2. Foundation Work: A solid concrete footing was laid to support the steel frame, ensuring long-term stability.
3. Steel Frame Assembly: The prefab steel components were assembled on-site using a crane, as shown in the construction drawings, with workers guiding the steel beams into place.
4. Wall and Roof Installation: PU sandwich panels were installed for the walls and roof to provide insulation and weather protection.
5. Finishing Touches: The warehouse was equipped with large sliding doors for easy entry and exit, as shown in the pictures, and was equipped with appropriate lighting and curb markings to ensure safety and order.
The images provided show the various stages of construction, from the initial frame setup to the almost completed warehouse, which has a blue and white color scheme and is numbered for easy identification.
The pre-engineered steel warehouse is finished, now offering our client in Niger a dependable and functional storage solution that will satisfy operational needs. Four steel container storage units, measuring 29 x 25 x 8 meters, provide a total of 2,900 square meters of storage space. The project was completed as per schedule, concerning the timeline indicated in the technical drawings, and has been functional since discharge. Images of the warehouse show clean, organized spaces with wide aisles between units for the movement of goods and vehicles; the client has expressed satisfaction regarding the functionality and durability of the structures as they have been integrated into their operations seamlessly.
This prefabricated warehouse project exemplifies Suzhou Daxiang's expertise in providing tailor-made industrial solutions to clients in different regions. A combination of efficient design, durable materials, and construction processes ensured the successful completion of the project, meeting the client's requirements for a reliable and spacious storage facility. The successful completion of this project underscores our commitment to supporting economic growth and industrial development through innovative, cost-effective, and reliable infrastructure solutions.
To learn more about our prefab steel structure projects or to discuss your requirements, please contact us!
Nosso horário
Seg, 21/11 - Quarta, 23/11: 9h - 20h
Qui, 24/11: fechado - Feliz Dia de Ação de Graças!
Sexta-feira, 25/11: 8h - 22h
Sábado, 26/11 - Dom, 27/11: 10h - 21h
(todos os horários são horário do leste)